All guides
July 27, 2026·4 min read

5 Red Flags in a Quote You Should Never Ignore

Signing a quote feels like a formality, until you find out you overpaid. Most people scan a quote for the total price and nothing else. But the details tell the real story. Here are the 5 signs that show up more often than you'd think, and what each one means for your wallet.

1. No breakdown between materials and labour

If a quote only shows a lump sum with no split between materials, labour, and other costs, there's no way to tell whether any part of it is priced above market. A vague line like '€3,200 for works' could mean anything.

Always ask for an itemized breakdown. Most vendors provide this without friction: refusal is itself a warning sign.

2. Unclear whether the price includes tax

This looks like a minor detail, but it can shift the final total by 15–25% depending on your local tax rate. Quotes that don't explicitly state whether the amount is tax-inclusive or exclusive leave room for confusion: confusion that rarely works in your favor.

Check this before comparing quotes: a €5,000 quote excluding tax is actually higher once tax is added, which can flip which quote is really cheaper.

3. Asks for more than 50% upfront

This is the one most people miss, because they focus on the total price rather than the payment terms. A deposit of 50% or more before any work starts shifts almost all the financial risk onto you.

Standard practice in most trades is 10–30% upfront, with the rest tied to delivery milestones. If a vendor asks for significantly more, ask why, and consider proposing staged payments instead.

4. No warranty period mentioned

A quote with no mention of warranty on materials or labour leaves you with no recourse if something goes wrong a few months later. This is often just an oversight rather than a deliberate omission. But the consequence for you is the same either way.

Ask explicitly for the warranty period and get it confirmed in writing, ideally within the quote itself.

5. Time pressure: 'this offer expires today'

Time pressure is a classic sales tactic used to get you to sign before you have a chance to compare or think it over. A vendor confident in a fair price has no reason to rush you.

A 24-hour deadline is more often a sign the price won't hold up to comparison than proof the offer is genuinely scarce.

None of these signs automatically mean you're being scammed. But each one is a reason to ask a follow-up question before signing. The fastest way to know for sure whether your quote is fair: compare it against real market prices.

Check your quote for free

Free, in full

Whose quote is this?

Your document stays private

Personal details are anonymised and never stored.